Challenge:

Provide traffic management services to keep workers and public safe:
  • With various projects a day or night, our teams had to be constantly responsive, flexible and work efficiently.
  • Projects continually changed (cancelled or reinstated) at a moments notice due to weather.
  • Coordinate and manage multiple vehicles and teams supplied across numerous locations simultaneously.

What T8 Traffic did:

  • Operated traffic control over numerous sites simultaneously.
  • Supported our client with all their various scenarios.
  • t8-traffic-control-sign-off-truckKept disruption to a minimum and site safety to a maximum.
  • Restored sites once work completed.

Outcome:

  • Continually kept pace with the volume of projects and multitude of locations, completing them on time and on budget to the satisfaction of our client.

A critical lesson:

  • Clear communication within our teams and our client was key for keeping pace.

Tamaki Drive Street Lighting Upgrade

Location: Tamaki Drive
Engaged by: Transfield
Project Duration: 6-8 months

Challenge:

Design and provide multiple traffic management closures

t8-traffic-control-setting-out-cones-tamakiWhat T8 Traffic did:

  • Designed approved traffic management plans.
  • Operated traffic control over numerous sites simultaneously.
  • Kept disruption to a minimum and site safety to a maximum.
  • Became the public point of contact.
  • Restored sites once work completed.

Outcome:

  • Minimised public disruption and inconvenience while safely completing the tasks.

A critical lesson:

  • Pedestrian management was vital. It was key to be approachable, represent our client requirements with integrity and handle public angst with grace and resolution.